TIDEL
Park Project
Brief
Description
The
extent of Air Conditioning and Mechanical ventilation works
carried out by us in TIDEL PARK LTD, comprises of the following:
| • |
12
Nos of 250 TR Air cooled Screw Chillers |
| • |
3
Nos of Plate Heat Exchangers |
| • |
338
Nos of Air Handling Units |
| • |
24
Nos of Pumps |
| • |
33
Nos Heat Recovery Units |
| • |
4
Banks of Thermal Energy Storage system of 6000 TR Hr capacity
each. |
| • |
28
Nos of Fan Coil Units |
| • |
150
Nos of Ventilation fans |
| • |
250
Nos of BTU Meters |
| • |
900
Nos Fire Dampers with smoke detectors |
The installation also includes 60000 sqm of duct work and
45000 sqm of duct insulation and 12000 metres of chilled water
piping with insulation, 53000 metres of conduiting and wiring
for the Building automation system and 8000 nos of grilles
and diffusers.
The
entire system is monitored and controlled by the Building
Automation System. The items monitored and controlled are:
| • |
Temperature
|
| • |
Humidity |
| • |
Energy
|
| • |
Brine flow |
| • |
Water flow |
| • |
Air flow |
| • |
Control valves |
| • |
On/Off/Trip Status |
| • |
Sequencing and
scheduling of equipment operations |
|